Shipbuilding Gantry Crane is mainly used for lifting the shipyard and reversing the ship block.

Solutions and Technical Characteristics 

1 lifting mechanism can achieve the synchronization control of two hook linkage, three hook lift and the operation of subsection turning over; 
2 Upper and lower trolley travel linkage synchronization control;
3 Automatic deviation correction control of crane, multi section precision calibration of encoder;
4 High reliability of optical fiber ring network;
5 Electrical room PLC or electrical room master PLC with remote substation optional control scheme
6 Constant power operation: running speed when light load, improve the working efficiency;
7 Reliable weighing system
8 Two gantry cranes can electrical linkage and lifting at same time by wireless
9 Friendly man-machine interface and humanized interface design can assist the operator to operate better. Intelligent fault alarm, processing and equipment maintenance function provide effective information to the maintenance personnel; 
10 Perfect CMS system record the operation instructions, mechanism working status, running stroke, weight, wind speed, etc., and there are video monitoring system to assist the operator.